There will be periodic traffic delays along Rancho Bernardo Rd between Bernardo Center Drive and Pomerado Rd July 9 through July 20. Both sides of the road in that area will be resurfaced and then re-lined during that time frame. Most of the work will transpire during the hours of 9 pm and 5 am, but at least one portion of a lane in each direction will be closed at any given time.

It is advised to utilize other means of travel during that time frame or be prepared for delays. Those who live on Rancho Bernardo Rd in that area have received advance notice of the work and advised vehicles will be towed if parked on Rancho Bernardo Rd. during that period.